Crews Building Power Lines Near Frozen Miss. Battle Winter
The largest, most expensive upgrade of the region's electrical transmission system in over 40 years is facing a major challenge. CAPX 2020 is 800 miles of new power lines built at twice the cost of the new Vikings stadium. But there's one leg of the project south of Wabasha where engineering is beating the elements of old man winter.