Watch CBS News

Gulf Oil Rig Plagued by Problems, Probe Finds

Last updated at 6:38 p.m. ET

Bad wiring and a leak in what's supposed to be a "blowout preventer." Sealing problems that may have allowed a methane eruption. Even a dead battery, of all things.

New disclosures Wednesday revealed a complicated cascade of deep-sea equipment failures and procedural problems in the oil rig explosion and massive spill that is still fouling the waters of the Gulf of Mexico and threatening industries and wildlife near the coast and on shore.

The disclosures were described in internal corporate documents, marked confidential but provided to a House committee by BP PLC, the well's operator, and by the manufacturer of the safety device. Congressional investigators released them.

A senior BP executive, Lamar McKay, cautioned lawmakers, "It's inappropriate to draw any conclusions before all the facts are known." But the documents established the firmest evidence to date of the sequence of catastrophic events that led to the explosion and worsening spill, a series of failures more reminiscent of the loss of the space shuttle Challenger than the wreck of the Exxon Valdez.

Special Section: Gulf Coast Oil Disaster
2nd Oil Containment Box Reaches Gulf Seafloor
Obama Seeks Greater Liability from BP on Spill
Fla. Gov. Crist Wants $35M from BP for Tourism
Gulf Spill Highlights Deepwater Drilling Risks
Poll: Support for More Oil Drilling Plummets
6 Dead Dolphins Wash Ashore; Oil's Role Unclear
Gulf Blame Game
"Drill, Baby Drill!" No More?
BP Oil Spill: Who's to Blame?

Like the 1986 Challenger disaster, the investigation into the Gulf spill may well show that complex and seemingly failproof technical systems went wrong because of overlooked problems that interacted with each other in unexpected ways. In the 1989 Exxon Valdez disaster, a captain simply ran his ship onto a reef in Alaska's Prince William Sound, spilling some 11 millions barrels of oil.

The April 20 BP rig explosion killed 11 people. Since then, nearly 4 million barrels of oil have spewed from the broken well pipe 5,000 feet underwater 40 miles off the Louisiana coast, threatening sensitive ecological marshes and wetlands and the region's fishing industry.

The gushing well's blowout preventer - supposedly "fail-safe" - never shut off oil flow as intended in emergencies, reports CBS News correspondent Mark Strassmann.That allowed methane gas to enter, possibly triggering the rig's deadly explosion. BP documents show this blowout preventer had design flaws, leaks in its hydraulic system, and a dead battery in its control pod.

They said that BP documents and others also indicated conflicting pipe pressure tests should have warned those on the rig that poor pipe integrity may have been allowing explosive methane gas to leak into the well.

"Significant pressure discrepancies were observed in at least two of these tests, which were conducted just hours before the explosion," said Rep. Henry Waxman, D-Calif., at a House hearing on the rig fire and oil leak, citing documents his committee had received from BP.

Asked about the tests, Steven Newman, president of Transocean, which owned the drilling rig, and Lamar McKay, president of BP America told the committee the pressure readings were worrisome.

They indicated "that there was something happening in the well bore that shouldn't be happening," said Newman. McKay said the issue "is critical in the investigation" into the cause of the accident.

The well explosion unleashed a massive oil spill that after three weeks remains uncontained.

But Waxman said important elements of what went wrong were beginning to surface.

While "we have far more questions than answers," it appears clear that there were problems with the blowout preventers before the accident and confusion almost right up to the time of the explosion over the success of a process in which cement is injected into the well to temporarily close it in anticipation of future production.

See the First Video of the Oil Leaking Underwater:

Watch CBS News Videos Online

In other developments Wednesday:

The White House asked Congress to raise the limits on BP's liability to cover damage from the spill beyond the $75 million cap now in law. It also wants oil companies to pay more into a federal oil spill cleanup fund.

BP president Lamar McKay said the company will pay any legitimate claim of damages beyond cleanup costs despite the federal cap.

On the Gulf Coast, a new containment box - a cylinder called a "top hat" - was placed on the sea floor near the well leak. Engineers hope to work out ways to avoid the problem that scuttled an earlier effort with a much bigger box before they move the cylinder over the end of the 5,000-foot-long pipe from the well.

The Minerals Management Service told a government panel of investigators in Kenner, La., that inspections of deepwater drilling rigs has turned up only "a couple of minor issues."

Gov. Charlie Crist asked BP PLC on Wednesday to pay nearly $35 million for an emergency ad campaign to assure the world that Florida's beaches and coastal waters are untainted by oil spill.

Mexican officials fear the Gulf oil spill could reach their coasts if the leak is not stopped by August, when seasonal currents start to reverse and flow south.

So far prevailing currents have carried at least 4 million gallons of spilled oil from a damaged BP well toward the north and east, away from Mexico and toward U.S. shores. But those currents start to shift by August, and by October the prevailing currents have reversed toward Mexico.

The House hearing into the spill was the third this week at which executives of BP and two other companies were questioned by lawmakers.

The committee produced one document from BP that provided the most detailed information to date on what led up to and may have caused the explosion and spill at the Deepwater Horizon rig, floating in mile-deep waters 40 miles off the coast of Louisiana, and why equipment designed to stop a spill failed to do the job.

Rep. Bart Stupak, D-Mich., said there were at least "four significant problems with the blowout preventer" - or BOP - including evidence that it had a significant hydraulic leak and a dead battery that was supposed to activate a so-called "deadman" trigger.

A 2001 report by Transocean, which made the BOP equipment, indicated there can be as many as 260 failure possibilities in the equipment, which is supposed to be the final safeguard against a well blowout by clamping down and sealing a gushing oil well, said Stupak, chairman of the panel's investigation's subcommittee.

"How can a device that has 260 failure modes be considered fail-safe?" asked Stupak.

Stupak said when an underwater remote vehicle tried to activate the blowout protector's devices designed to ram through the pipe and seal it, a loss of hydraulic pressure was discovered in the device's emergency power component.

When dye was injected "it showed a large leak coming from a loose fitting," said Stupak, citing BP documents. He said officials at Cameron, the company that made the preventer, had told the committee the leak was not believed to have been caused by the blowout because other fittings in the system were tight.

Stupak also questioned why the BOP had been modified.

Newman, the Transocean executive told the committee that, indeed, the BOP had been modified in 2005 at the request of BP and with approval of the Minerals Management Service.

Stupak said the committee had been told that one of the BOP's ram drivers had been changed so it could be used for routine testing and was no longer designed to activate in an emergency. He said after the spill BP "spent a day trying to use this ... useless test ram" which no longer was configured for emergency use.

Executives of the companies involved have sought to shift blame on one another at Senate and House hearings this week on the spill.

BP has cited the failure of the blowout preventer owned by Transocean, which in turn has raised questions about the cementing process conducted by Halliburton, a BP subcontractor.

At Senate hearings Tuesday and again before the House panel, Timothy Probert, an executive of Halliburton, said that its work had been completed except for the installation of a final cement cap and that it was done according to the BP drilling plan.

View CBS News In