Construction To Begin On $2.1B Red River Diversion Project

ST. PAUL, Minn. (AP) — The U.S. Army Corps of Engineers says construction activities will begin this week on the first phase of the $2.1 billion Red River flood diversion project in the Fargo-Moorhead area.

The Corps said Tuesday that Ames Construction of Burnsville, Minnesota, is sending equipment to the site near Horace, North Dakota, to conduct pre-construction studies for the diversion inlet. The inlet will include a control structure with three gates to regulate flows into the diversion channel around Fargo on the North Dakota side of the river.

Minnesota and upstream opponents are fighting the project in court. The project would redirect floodwaters on the north-flowing river around Fargo, but would inundate farmland south of the cities during times of serious flooding. Minnesota has refused to issue permits for work on its side.

(© Copyright 2017 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

Read more
f

We and our partners use cookies to understand how you use our site, improve your experience and serve you personalized content and advertising. Read about how we use cookies in our cookie policy and how you can control them by clicking Manage Settings. By continuing to use this site, you accept these cookies.