Editor's Note...
Updated: 03/24/08. All times in EDT.
ORBIT....SITE..TIG........LANDING
TBD
STS-124 IN-FLIGHT ANOMALY LOG
Editor's Note...
The Shuttle Reference Manual is available on line to provide additional details. NOTE: Inconsequential nits and glitches are not listed.
- Nothing at this time
STS-124 MISSION PRIORITIES
Posted: 04/04/08 (from NASA's STS-123 press kit)
- TBD
STS-124 HARDWARE/PAYLOAD DATA
Mission...........STS-124 (flight 123)
Orbiter...........Discovery (35th flight)
Discovery.........281/12:13:54
STS Program.......1153/01:39:29
Main engines......SSME 1: 2051; SSME 2: 2048; SSME 3: 2058
SRB...............Bi134/RSRM102
External tank.....128
OMS pods..........LP01/38/F5; RP03/36/F5
FRCS..............FRC3/35/F5
Fuel Cells........No. 1: TBD; No. 2: TBD; No. 3: TBD
Flight software...OI-32
Pad/MLP...........LC-39A/MLP-3
Runway............33/15, KSC Shuttle Landing Facility
MECO Apo/Per......122 nautical miles
OMS-2 Apo/Per.....TBD
Rendezvous........TBD
Inclination.......51.6 degrees
Primary TAL site..Zaragoza; alternate: Moron; New site: Istres, France (Abort Data)
Cryo/N2 tanks.....5 PRSD/6 GN2
Payload...........JAXA Kibo pressurized laboratory module
RMS................301
OBSS..............N/A (returns with OBSS No. 3)
Airlock...........External

STS-124 Flight Hardware
SPACE STATION AND SHUTTLE CREW STATISTICS
See the Statistics Page for additional demographic data or NASA's astronaut bio page. A listing of active cosmonauts is available on Dennis Newkirk's Russian Aerospace Guide. NOTES: Ages as of launch; MS: mission specialist; PS: payload specialist; FE: flight engineer; SO: science officer; EV: spacewalker; M/X: Married/single/divorced with X kids
ISS-17 Commander:
Sergei Volkov
Soyuz TMA-12/ISS-17; M/1; DOB: 04/01/73; Hometown: Chuguyev, Kharkov Region, Ukraine; TIS: Launched 04/08/08
ISS-17 FE:
Cosmonaut Oleg Kononenko
Soyuz TMA-12/ISS-17; M/1; DOB: 10/27/55; Hometown: Chardzhow, Turkmenia; TIS: Launched 04/08/08
ISS-16/17 FE:
Garrett Reisman, Ph.D.
Rookie; M/0; DOB: 02/10/68; Hometown: Parsippany, NJ; TIS: Launch 03/11/08

STS-124 Commander:
Navy Cmdr. Mark Kelly
STS-108,121; S/2; DOB: 02/21/64; Hometown: West Orange, NJ; Time in space: 25 days
Seating: Up-1/Up-1
Pilot:
Navy Cmdr. Ken Ham
Rookie; M/2; DOB: 12/12/64; Hometown: Plainfield, NJ; TIS: 0 days
Seating: Up-2/Up-2
MS1:
Karen Nyberg, Ph.D.
Rookie; S/0; DOB: 10/07/69; Hometown: Vining, MN; TIS: 0 days
Seating: Up-3/Up-3
MS2/FE/EV2:
AF Col. Ronald Garan
Rookie; M/3; DOB: 10/30/61; Hometown: Yonkers, NY; TIS: 0 days
Seating: Up-4/Up-4
MS3/EV1:
Michael Fossum (JAXA)
STS-121; M/0; DOB: 12/19/57; Hometown: Sioux Falls, SD; TIS: 12.8 days
Seating: Dn-5/Dn-5
MS4:
Akihiko Hoshide
Rookie; S/?; DOB: ??/??/68; Hometown: Tokyo; TIS: 0 days
Seating: Dn-6/Dn-6
MS5 (up):
Gregory Chamitoff, Ph.D.
Rookie; M/2; DOB: 08/06/62; Hometown: Montreal, Canada; TIS: 0 days
Seating: Dn-7 (launch)
MS5 (down):
Garrett Reisman, Ph.D.
Rookie; M/0; DOB: 02/10/68; Hometown: Parsippany, NJ; TIS: 0 days before current mission
Seating: Dn-7 (landing)
STS-124 Crew Seating for Launch and Entry
POSITION.......CREW...............LAUNCH...LAND
Commander......Mark Kelly.........Up-1.....Up-1
Pilot..........Ken Ham............Up-2.....Up-2
MS1............Karen Nyberg.......Up-3.....Up-3
MS2/FE/EV2.....Ronald Garan.......Up-4.....Up-4
MS3/EV1........Michael Fossum.....Down-5...Down-5
MS4............Akihiko Hoshide....Down-6...Down-6
MS5 (up).......Greg Chamitoff.....Down-7...N/A
MS5 (down).....Garrett Reisman....N/A......Down-7
EVA.....CREW...........SUIT MARKINGS.......IV
EVA-1...EV1 Fossum.....Red stripes.........Ham
........EV2 Garan......No stripes
EVA-2...EV1 Fossum
........EV2 Garan
EVA-3...EV1 Fossum
........EV2 Garan
Crew Tasks...Detail..............Prime.........Backup
ET Photo.....Video...............Nyberg
ET Photo.....Sill camera.........Fossum
Logistics....Transfers...........Hoshide.......Kelly
JEM..............................Hoshide.......Nyberg
SRMS.........FD-2 TPS survey.....Ham, Nyberg...Garan
SRMS.........OBSS handoff........Nyberg........N/A
SRMS.........Late inspection.....Ham, Nyberg...Garan, Fossum
SSRMS........OBSS handoff........Hoshide.......Chamitoff
SSRMS........JEM install.........Hoshide.......Nyberg
SSRMS........JLP relocate........Nyberg........Chamitoff
SSRMS........NTA install.........Nyberg........Hoshide
JRMS.........Final deploy........Hoshide.......Nyberg
Launch Control Personnel
Launch Director......Mike Leinbach
NASA Test Director...Jeff Spaulding
OTC..................Teresa Annulis
KSC Commentator......Allard Beutel
Mission Control Personnel
STS MCC..............Flight Director.....PAO................CAPCOM
Ascent FD............Norm Knight.........Rob Navias.........Terry Virts
Weather.....................................................Kevin Ford
Orbit 1 FD (ld)......Matt Abbott.........Rob Navias.........Nick Patrick
Orbit 2 FD...........Mike Sarafin........Brandi Dean........Al Drew
Planning FD..........Paul Dye............Josh Byerly........Shannon Lucid
Entry FD.............Richard Jones.......Rob Navias.........Terry Virts
Weather.....................................................Kevin Ford
Team 4...............TBD
ISS MCC..............Flight Director.....Japan MCC..........ISS CAPCOM
Orbit 1..............Bob Dempsey.........TBD................Mark Vande Hei
Orbit 2 (ld).........A. Hasbrook.........TBD................Chris Cassidy
Orbit 3..............Emily Nelson........TBD................Mike Jensen
Team 4...............Brian Smith
Support..............Name................Name...............Name
MOD Rep..............Phil Engelauf
STS Manager..........John Shannon
MMT (JSC)............LeRoy Cain
MMT (KSC)............LeRoy Cain
Weather Coord........Mark Polansky
Launch STA...........Steve Lindsey
Entry STA (KSC)......Steve Lindsey
Entry STA (EAFB).....Pam Melroy
TAL Zaragoza.........Barry Wilmore
TAL Istres...........Joe Tanner
TAL Moron............Randy Bresnik
STA Shadow...........TBD
JSC PAO at KSC.......TBD
Astro Support........Kay Hire............Tracy Caldwell....Jose Hernandez
Family Support.......Dorothy Metcalf.....Piers Sellers.....Stephanie Wilson
STS-124 COUNTDOWN SUMMARY TIMELINE
Editor's Note...
Updated: 05/02/08
As always, all countdown events prior to the end of the T-minus nine-minute hold are targeted to the opening of the shuttle's launch window. Please note that NASA rounds down, not up, for countdown calculations. The release of the final hold at T-minus nine-minute is targeted to the actual launch time (times in EDT):
EDT...........EVENT
Wed 05/28/08
06:30 PM......Call to stations
07:00 PM......Countdown begins
Thu 05/29/08
05:00 AM......Fuel cell reactant load preps
10:30 AM......MEC/SRB power up
11:00 AM......Clear crew module
11:00 AM......Begin 4-hour built-in hold
11:00 AM......Clear blast danger area
11:45 AM......Orbiter pyro-initiator controller test
11:55 AM......SRB PIC test
12:55 PM......Master events controller pre-flight BITE test
01:00 PM......Mission management team meets
03:00 PM......Resume countdown
04:30 PM......Fuel cell oxygen loading begins
07:00 PM......Fuel cell oxygen load complete
07:00 PM......Fuel cell hydrogen loading begins
09:30 PM......Fuel cell hydrogen loading complete
10:30 PM......Pad open; ingress white room
11:00 PM......Begin 4-hour built-in hold
11:00 PM......Crew module clean and vacuum
11:30 PM......OMBUU demate
Fri 05/30/08
01:00 AM......Secure MLP interior
03:00 AM......Countdown resumes
03:00 AM......Main engine preps
03:00 AM......MECs 1 and 2 on; avionics system checkout
04:00 AM......Remove OMS engine covers, throat plugs
04:30 AM......Deflate RSS dock seals; tile inspection
05:00 AM......Tile inspection
09:00 AM......TSM prepped for fueling
11:00 AM......Begin 13-hour 37-minute hold
12:15 PM......Crew equipment, weather briefings
01:30 PM......OIS communications check
02:20 PM......JSC flight control team on station
03:30 PM......Comm activation
04:00 PM......Crew module voice checks
05:00 PM......Flight crew equipment late stow
05:30 PM......Debris inspection
08:30 PM......Rotating service structure to park position
09:30 PM......Final TPS, debris inspection
10:30 PM......Ascent switch list
Sat 05/31/08
12:37 AM......Resume countdown
12:37 AM......ASP cockpit config
12:57 AM......Pad clear of non-essential personnel
12:57 AM......APU bite test
01:47 AM......Fuel cell activation
02:37 AM......Booster joint heater activation
03:07 AM......MEC pre-flight bite test
03:22 AM......Tanking weather update
04:07 AM......Final fueling preps; launch area clear
04:37 AM......Red crew assembled
05:22 AM......Fuel cell integrity checks complete
05:37 AM......Begin 2-hour built-in hold (T-minus 6 hours)
05:47 AM......Safe-and-arm PIC test
06:30 AM......Crew wakeup
06:37 AM......External tank ready for loading
06:52 AM......Mission management team tanking meeting
07:37 AM......Resume countdown (T-minus 6 hours)
07:37 AM......LO2, LH2 transfer line chilldown
07:47 AM......Main propulsion system chill down
07:47 AM......LH2 slow fill
08:17 AM......LO2 slow fill
08:22 AM......Hydrogen ECO sensors go wet
08:27 AM......LO2 fast fill
08:37 AM......LH2 fast fill
10:32 AM......LH2 topping
10:37 AM......LH2 replenish
10:37 AM......LO2 replenish
10:37 AM......Begin 2-hour 30-minute built-in hold (T-minus 3 hours)
10:37 AM......Closeout crew to white room
10:37 AM......External tank in stable replenish mode
10:52 AM......Astronaut support personnel comm checks
11:22 AM......Pre-ingress switch reconfig
11:40 AM......Crew breakfast/photo op (recorded)
12:00 PM......NASA television launch coverage begins
12:32 PM......Final crew weather briefing
12:42 PM......Crew suit up begins
01:07 PM......Resume countdown (T-minus 3 hours)
01:12 PM......Crew departs O&C building
01:42 PM......Crew ingress
02:32 PM......Astronaut comm checks
02:57 PM......Hatch closure
03:27 PM......White room closeout
03:47 PM......Begin 10-minute built-in hold (T-minus 20m)
03:57 PM......NASA test director countdown briefing
03:57 PM......Resume countdown (T-minus 20m)
03:58 PM......Backup flight computer to OPS 1
04:02 PM......KSC area clear to launch
04:08 PM......Begin final built-in hold (T-minus 9m)
04:38 PM......NTD launch status verification
04:53:05 PM...Resume countdown (T-minus 9m)
04:54:35 PM...Orbiter access arm retraction
04:57:05 PM...Launch window opens
04:57:05 PM...Hydraulic power system (APU) start
04:57:10 PM...Terminate LO2 replenish
04:58:05 PM...Purge sequence 4 hydraulic test
04:58:05 PM...IMUs to inertial
04:58:10 PM...Aerosurface profile
04:58:35 PM...Main engine steering test
04:59:10 PM...LO2 tank pressurization
04:59:30 PM...Fuel cells to internal reactants
04:59:35 PM...Clear caution-and-warning memory
05:00:05 PM...Crew closes visors
05:00:08 PM...LH2 tank pressurization
05:01:15 PM...SRB joint heater deactivation
05:01:34 PM...Shuttle GPCs take control of countdown
05:01:44 PM...SRB steering test
05:01:58 PM...Main engine start (T-6.6 seconds)
05:02:05 PM...SRB ignition (LAUNCH)
STS-124 ABORT BOUNDARIES
Editor's Note...
Posted: 04/05/08 (inertial velocity; includes Earth's rotation)
EDT..........T+........EVENT.....................VELOCITY (inertial): FPS....MPH
TBD
STS-124 TRAJECTORY TIMELINE
Editor's Note...
Updated: 05/02/08 (not yet reflected in flight plan)
DATE/EDT.......DD...HH...MM...EVENT
05/31/08
Sat 05:02 PM...00...00...00...Launch
Sat 05:39 PM...00...00...37...OMS-2 perigee raise burn
Sat 08:01 PM...00...02...55...NC-1 rendezvous rocket firing
06/01/08
Sun 10:18 AM...00...17...04...NC-2 rendezvous rocket firing
Sun 07:22 PM...01...02...13...NC-3 rendezvous rocket firing
06/02/08
Mon 08:53 AM...01...15...55...NH rendezvous rocket firing
Mon 09:39 AM...01...16...40...NC-4 rendezvous rocket firing
Mon 11:09 AM...01...18...11...TI rendezvous rocket firing
Mon 01:51 PM...01...20...48...DOCKING
06/10/08
Tue 08:47 AM...09...17...15...Undocking
Tue 09:55 AM...09...18...30...Separation burn No. 1
Tue 10:23 AM...09...18...58...Separation burn No. 2
06/12/08
Thu 09:17 AM...14...16...24...Orbit adjustment burn
06/13/08
Fri 11:03 AM...12...18...03...Deorbit ignition
Fri 12:05 PM...12...19...06...Landing
STS-124 DOCKING TIMELINE
Editor's Note...
Posted: 04/04/08
DATE/EDT...DD...HH...MM...EVENT
TBD
STS-124 UNDOCKING TIMELINE
EDT........DD...HH...MM...EVENT
TBD
STS-124 RE-ENTRY TIMELINE
Editor's Note...
Updated: 04/04/08 (in EDT)
EDT...........EVENT
TBD
STS-124 NASA TELEVISION SCHEDULE
Editor's Note...
REV. BASIC (04/04/08)
NASA STS-124 TV Schedule (at NASA's shuttle web site)
Live NASA TV Links
Editor's note:
An asterisk marks a change from the previous schedule. NASA's daily video highlights reel will be replayed on the hour during crew sleep periods. The timing of actual events is subject to change and some events may or may not be carried live on NASA television.
NASA Note: NASA Television is now carried on an MPEG-2 digital signal accessed via satellite AMC-6, at 72 degrees west longitude, transponder 17C, 4040 MHz, vertical polarization. A Digital Video Broadcast (DVB) - compliant Integrated Receiver Decoder (IRD) with modulation of QPSK/DBV, data rate of 36.86 and FEC 3/4 will be needed for reception. NASA mission coverage will be simulcast digitally on the Public Services Channel (Channel #101); the Education Channel (Channel #102) and the Media Services Channel (Channel #103). Further information is available at: http://www1.nasa.gov/multimedia/nasatv/digital.html. Mission Audio can be accessed on AMC-6, Transponder 13, 3971.3 MHz, horizontal polarization.
ORB.EVENT.....................................DD/HH:MM...EDT........GMT
TBD
STS-124 SUMMARY TIMELINE
05/02/08 (times given in EDT and mission elapsed time):
Acronyms:
- CMG: Control moment gyro
- C&C: Command and control
- DDCU: DC-to-DC Converter unit
- DCSU: DC switching unit
- EATCS: External Active Thermal Control System
- EPS: Electrical power system
- ET: External tank
- GNC: Guidance, navigation and control
- IATCS: Internal Active Thermal Control System
- MBSU: Main bus switching unit
- MDM: Multiplexer-demultiplexer
- MT: Mobile transporter
- OBSS: Orbiter boom sensor system
- RBI: Remote bus isolator
- S5: Starboard solar array truss spacer segment
- SPDA: Secondary power distribution assembly
- SRMS: Shuttle robot arm
- SSRMS: Station robot arm
- USOS: U.S. segment of space station
- WLES: Wing leading edge sensor system
- SSPTS: Station-to-shuttle power transfer system
DATE/EST.......DD...HH...MM...EVENT
Flight Day 1
05/31/08
Sat 05:02 PM...00...00...00...Launch
Sat 05:39 PM...00...00...37...OMS-2 rocket firing
Sat 05:52 PM...00...00...50...Post insertion timeline begins
Sat 07:32 PM...00...02...30...Laptop computer setup (part 1)
Sat 07:32 PM...00...02...30...GIRA installation
Sat 07:32 PM...00...02...30...RMS powerup
Sat 08:01 PM...00...02...59...NC1 rendezvous rocket firing
Sat 08:17 PM...00...03...15...Group B computer powerdown
Sat 08:32 PM...00...03...30...SEE setup
Sat 09:07 PM...00...04...05...ET umbilical downlink
Sat 09:07 PM...00...04...05...Wing leading edge sensors activated
Sat 09:22 PM...00...04...20...ET photo downlink
Sat 09:32 PM...00...04...30...ET handheld video downlink
Sat 11:02 PM...00...06...00...Crew sleep begins
Flight Day 2
06/01/08
Sun 07:02 AM...00...14...00...Crew wakeup
Sun 09:02 AM...00...16...00...Ergometer setup
Sun 10:02 AM...00...17...00...Laptop computer setup (part 2)
Sun 10:18 AM...00...17...16...NC-2 rendezvous rocket firing
Sun 10:27 AM...00...17...25...Spacesuit checkout preps
Sun 10:57 AM...00...17...55...Spacesuit checkout
Sun 11:12 AM...00...18...10...Shuttle robot arm (SRMS) powerup
Sun 11:27 AM...00...18...25...SSRMS checkout
Sun 12:12 PM...00...19...10...SSRMS payload bay survey
Sun 12:42 PM...00...19...40...SSRMS end effector heat shield survey
Sun 02:52 PM...00...21...50...Crew meal
Sun 03:52 PM...00...22...50...PAO event
Sun 04:12 PM...00...23...10...Spacewalk equipment prepped for transfer
Sun 04:12 PM...00...23...10...Centerline camera setup
Sun 04:42 PM...00...23...40...Orbiter docking system ring extension
Sun 05:12 PM...01...00...10...OMS pod survey
Sun 05:12 PM...01...00...10...Nozzle view
Sun 05:32 PM...01...00...30...Playback ops
Sun 05:52 PM...01...00...50...Rendezvous tools checkout
Sun 07:22 PM...01...02...20...NC-3 rendezvous rocket firing
Sun 10:32 PM...01...05...30...Crew sleep begins
Flight Day 3
06/02/08
Mon 06:32 AM...01...13...30...STS/ISS crew wakeup
Mon 07:57 AM...01...14...55...Group B computer powerup
Mon 08:12 AM...01...15...10...Rendezvous timeline begins
Mon 08:52 AM...01...15...50...ISS daily planning conference
Mon 08:53 AM...01...15...51...NH rendezvous rocket firing
Mon 09:39 AM...01...16...37...NC-4 rendezvous rocket firing
Mon 10:32 AM...01...17...30...Spacesuits removed from airlock
Mon 11:09 AM...01...18...07...TI rocket firing (range to ISS: 9.2 sm)
Mon 11:42 AM...01...18...40...ISS crew meal
Mon 12:42 PM...01...19...40...Approach timeline begins
Mon 12:52 PM...01...19...50...RPM photography
Mon 01:27 PM...01...20...25...PMA-2 prepped for docking
Mon 01:51 PM...01...20...49...DOCKING
Mon 02:12 PM...01...21...10...Leak checks
Mon 02:37 PM...01...21...35...Group B computer powerdown
Mon 02:42 PM...01...21...40...Post docking laptop reconfig
Mon 02:47 PM...01...21...45...Orbiter docking system prepped for ingress
Mon 03:07 PM...01...22...05...Hatch open
Mon 03:52 PM...01...22...50...Welcome aboard!
Mon 04:02 PM...01...23...00...Safety briefing
Mon 04:27 PM...01...23...25...Post-docking EVA transfer
Mon 04:27 PM...01...23...25...Soyuz seatliner transfer to ISS
Mon 05:02 PM...02...00...00...Soyuz seatliner installation
Mon 05:02 PM...02...00...00...Middeck transfers
Mon 05:07 PM...02...00...05...REBA checkout
Mon 05:37 PM...02...00...35...Airlock preps
Mon 06:27 PM...02...01...25...EVA-1: Procedures review
Mon 08:57 PM...02...03...55...EVA-1: Mask pre-breathe
Mon 09:42 PM...02...04...40...EVA-1: Airlock 10.2 psi depress
Mon 10:02 PM...02...05...00...ISS crew sleep begins
Mon 10:32 PM...02...05...30...STS crew sleep begins
Flight Day 4
06/03/08
Tue 06:32 AM...02...13...30...Crew wakeup
Tue 07:12 AM...02...14...10...EVA-1: 14.7 psi repress/hygiene break
Tue 07:57 AM...02...14...55...EVA-1: Airlock depress to 10.2 psi
Tue 08:02 AM...02...15...00...SSRMS maneuvers to OBSS grapple position
Tue 08:22 AM...02...15...20...EVA-1: Campout EVA preps
Tue 08:32 AM...02...15...30...ISS daily planning conference
Tue 09:57 AM...02...16...55...EVA-1: Spacesuit purge
Tue 10:12 AM...02...17...10...EVA-1: Spacesuit prebreathe
Tue 11:02 AM...02...18...00...EVA-1: Crew lock depressurization
Tue 11:32 AM...02...18...30...EVA-1: Spacesuits to battery power
Tue 11:37 AM...02...18...35...EVA-1: Airlock egress
Tue 12:07 PM...02...19...05...EVA-1 (Garan): OBSS boom transfer to shuttle
Tue 12:07 PM...02...19...05...EVA-1 (Fossum): Elbow camera release
Tue 12:27 PM...02...19...25...EVA-1 (Fossum): Open node 2 window covers
Tue 12:57 PM...02...19...55...EVA-1 (Fossum): OBSS boom transfer to shuttle
Tue 01:27 PM...02...20...25...EVA-1 (Fossum): JPM preps
Tue 01:42 PM...02...20...40...SRMS grapples OBSS boom
Tue 01:52 PM...02...20...50...SSRMS ungrapples OBSS boom
Tue 01:57 PM...02...20...55...EVA-1 (Garan): JPM preps
Tue 02:32 PM...02...21...30...SSRMS grapples Node 2
Tue 02:47 PM...02...21...45...SOKOL suit leak check
Tue 03:07 PM...02...22...05...SOKOL suit drying
Tue 03:17 PM...02...22...15...EVA-1 (Fossum): Release PM window launch locks
Tue 03:37 PM...02...22...35...EVA-1: S3/S4 SARJ datam A inspection
Tue 04:17 PM...02...23...15...SSRMS grapples JPM
Tue 04:37 PM...02...23...35...SSRMS unberths JPM
Tue 05:07 PM...03...00...05...EVA-1: Get aheads
Tue 05:32 PM...03...00...30...EVA-1: Cleanup and airlock ingress
Tue 06:02 PM...03...01...00...EVA-1: Airlock repressurization
Tue 06:07 PM...03...01...05...JPM installation
Tue 06:12 PM...03...01...10...Spacesuit servicing
Tue 06:27 PM...03...01...25...CBM first stage bolts
Tue 06:47 PM...03...01...45...CBM second stage bolts
Tue 07:22 PM...03...02...20...CBCS deactivation and removal
Tue 08:17 PM...03...03...15...JPM vestibule pressure leak check
Tue 10:02 PM...03...05...00...ISS crew sleep begins
Tue 10:32 PM...03...05...30...STS crew sleep begins
Flight Day 5
06/04/08
Wed 06:32 AM...03...13...30...Crew wakeup
Wed 08:32 AM...03...15...30...ISS daily planning conference
Wed 09:17 AM...03...16...15...Vestibule outfitting
Wed 09:42 AM...03...16...40...Equipment lock preps
Wed 09:47 AM...03...16...45...OBSS sensor checkout
Wed 10:27 AM...03...17...25...EVA tools prepped
Wed 12:17 PM...03...19...15...Middeck transfers
Wed 12:32 PM...03...19...30...Node 2 aft IMV installation
Wed 12:32 PM...03...19...30...Jumper channel B initial activation
Wed 01:02 PM...03...20...00...Crew meals begin
Wed 02:02 PM...03...21...00...Vestibule outfitting continues
Wed 02:27 PM...03...21...25...Middeck transfers resume
Wed 02:52 PM...03...21...50...Crew meals begin
Wed 04:47 PM...03...23...45...JPM hatch opening
Wed 05:02 PM...04...00...00...JPM ingress
Wed 05:27 PM...04...00...25...JPM PCS installation
Wed 05:47 PM...04...00...45...FSE ACM removal
Wed 06:17 PM...04...01...15...JPM setup
Wed 06:27 PM...04...01...25...EVA-2: Procedures review
Wed 07:27 PM...04...02...25...JPM RMS rack transfer
Wed 08:57 PM...04...03...55...EVA-2: Mask pre-breathe and tool config
Wed 09:42 PM...04...04...40...EVA-2: Airlock depress to 10.2 psi
Wed 10:02 PM...04...05...00...ISS crew sleep begins
Wed 10:32 PM...04...05...30...STS crew sleep begins
Flight Day 6
06/05/08
Thu 06:32 AM...04...13...30...Crew wakeup
Thu 07:12 AM...04...14...10...EVA-2: 14.7 psi repress/hygiene break
Thu 07:57 AM...04...14...55...EVA-2: Airlock depress to 10.2 psi
Thu 08:22 AM...04...15...20...EVA-2: Campout EVA preps
Thu 08:22 AM...04...15...20...ISS daily planning conference
Thu 08:37 AM...04...15...35...JPM RMS umbilical
Thu 08:47 AM...04...15...45...JPM outfitting
Thu 09:57 AM...04...16...55...EVA-2: Spacesuit purge
Thu 10:12 AM...04...17...10...EVA-2: Spacesuit prebreathe
Thu 11:02 AM...04...18...00...EVA-2: Crew lock depressurization
Thu 11:32 AM...04...18...30...EVA-2: Spacesuits to battery power
Thu 11:37 AM...04...18...35...EVA-2: Airlock egress/setup
Thu 12:07 PM...04...19...05...EVA-2: Install forward/aft JIVE
Thu 12:57 PM...04...19...55...JPM vestibule 3 outfitting
Thu 12:57 PM...04...19...55...EVA-2: Remove RMS cover and EE MLI
Thu 01:52 PM...04...20...50...EVA-2: Zenith ACBM preps
Thu 02:22 PM...04...21...20...EVA-2: Install TR and KL covers
Thu 03:02 PM...04...22...00...EVA-2: Node 2 thermal blanket installation
Thu 03:32 PM...04...22...30...EVA-2: S1 NTA preps
Thu 03:57 PM...04...22...55...JLP egress
Thu 05:02 PM...05...00...00...JPM ungrapple
Thu 05:02 PM...05...00...00...EVA-2: Get aheads
Thu 05:12 PM...05...00...10...Node 2 zenith CPA installation
Thu 05:32 PM...05...00...30...EVA-2: Cleanup and airlock ingress
Thu 05:37 PM...05...00...35...SSRMS grapples PDGF-3
Thu 06:02 PM...05...01...00...EVA-2: Airlock repressurization
Thu 06:07 PM...05...01...05...SSC setup
Thu 06:12 PM...05...01...10...Spacesuit servicing
Thu 10:02 PM...05...05...00...ISS crew sleep begins
Thu 10:32 PM...05...05...30...STS crew sleep begins
Flight Day 7
06/06/08
Fri 06:32 AM...05...13...30...Crew wakeup
Fri 08:32 AM...05...15...30...ISS daily planning conference
Fri 09:32 AM...05...16...30...Focused inspection (if necessary)
Fri 09:42 AM...05...16...40...JLP vestibule configure for demating
Fri 10:02 AM...05...17...00...Middeck transfers
Fri 12:12 PM...05...19...10...JLP vetibule depressurization
Fri 01:37 PM...05...20...35...PAO event
Fri 01:57 PM...05...20...55...Crew meals begin
Fri 02:02 PM...05...21...00...JLP grappled
Fri 02:12 PM...05...21...10...Node 2 CBM demate
Fri 02:57 PM...05...21...55...JLP unberthed
Fri 03:07 PM...05...22...05...JLP moved to JPM outboard
Fri 03:37 PM...05...22...35...JLP install on JEM
Fri 03:57 PM...05...22...55...1st stage bolts
Fri 04:17 PM...05...23...15...2nd stage bolts
Fri 05:02 PM...06...00...00...JRMS viewing
Fri 05:57 PM...06...00...55...JLP vestibule pressure check
Fri 05:57 PM...06...00...55...JRMS MA final activation
Fri 06:27 PM...06...01...25...JEM RMS stress release
Fri 09:32 PM...06...04...30...ISS crew sleep begins
Fri 10:02 PM...06...05...00...STS crew sleep begins
Flight Day 8
06/07/08
Sat 06:02 AM...06...13...00...Crew wakeup
Sat 08:02 AM...06...15...00...ISS daily planning conference
Sat 09:22 AM...06...16...20...Middeck transfers
Sat 09:42 AM...06...16...40...JPM RMS bus mon setup
Sat 10:27 AM...06...17...25...JRMS HRM release
Sat 11:52 AM...06...18...50...JPM RMS initial deploy
Sat 01:32 PM...06...20...30...PAO event
Sat 01:32 PM...06...20...30...ISS meal
Sat 01:52 PM...06...20...50...STS meal
Sat 02:52 PM...06...21...50...PAO event
Sat 02:52 PM...06...21...50...EVA tools configured
Sat 03:12 PM...06...22...10...JLP vestibule outfitting
Sat 03:37 PM...06...22...35...Reboost config 3
Sat 05:27 PM...07...00...25...EVA-3: Procedures review
Sat 07:02 PM...07...02...00...JAXA PAO event
Sat 07:57 PM...07...02...55...EVA-3: Mask pre-breathe/tool config
Sat 08:42 PM...07...03...40...EVA-3: Airlock depress to 10.2 psi
Sat 09:02 PM...07...04...00...ISS crew sleep begins
Sat 09:32 PM...07...04...30...STS crew sleep begins
Flight Day 9
06/08/08
Sun 05:32 AM...07...12...30...Crew wakeup
Sun 06:12 AM...07...13...10...EVA-3: 14.7 psi repress/hygiene break
Sun 06:57 AM...07...13...55...EVA-3: Airlock depress to 10.2 psi
Sun 07:22 AM...07...14...20...EVA-3: Campout EVA preps
Sun 08:57 AM...07...15...55...EVA-3: Spacesuit purge
Sun 09:12 AM...07...16...10...EVA-3: Spacesuit prebreathe
Sun 10:02 AM...07...17...00...EVA-3: Crew lock depressurization
Sun 10:32 AM...07...17...30...EVA-3: Spacesuits to battery power
Sun 10:37 AM...07...17...35...EVA-3: Airlock egress
Sun 11:07 AM...07...18...05...EVA-3: Fossum: Retrieve ESP-3 NTA
Sun 11:07 AM...07...18...05...EVA-3: Garan: Remove S1 NTA
Sun 11:57 AM...07...18...55...EVA-3: Garan: Stow S1 NTA
Sun 12:17 PM...07...19...15...EVA-3: Fossum: Stow S1 NTA on fram
Sun 12:27 PM...07...19...25...EVA-3: Garan: S1 NTA install
Sun 12:52 PM...07...19...50...EVA-3: Fossum: Cleanup ESP-3 worksite
Sun 01:22 PM...07...20...20...EVA-3: Garan: SSRMS cleanup
Sun 01:52 PM...07...20...50...EVA-3: Fossum: JRMS MLI and launch lock removal
Sun 01:52 PM...07...20...50...EVA-3: Garan: S1 NTA QD connect
Sun 02:42 PM...07...21...40...EVA-3: Fossum: WNDW bolts
Sun 02:42 PM...07...21...40...EVA-3: Garan: CP9 ETVCG retrieve
Sun 02:57 PM...07...21...55...EVA-3: Fossum: Deploy ACBM MMOD shields
Sun 03:27 PM...07...22...25...EVA-3: Fossum: CP9 ETVCG retrieve
Sun 04:12 PM...07...23...10...EVA-3: Cleanup and airlock ingress
Sun 04:37 PM...07...23...35...EVA-3: Airlock repressurization
Sun 05:02 PM...08...00...00...Spacesuit servicing
Sun 05:22 PM...08...00...20...JPM RMS final deploy
Sun 05:52 PM...08...00...50...JPM RMS maneuver to stow position
Sun 09:02 PM...08...04...00...ISS crew sleep begins
Sun 09:32 PM...08...04...30...STS crew sleep begins
Flight Day 10
06/09/08
Mon 05:32 AM...08...12...30...Crew wakeup
Mon 07:32 AM...08...14...30...ISS daily planning conference
Mon 08:32 AM...08...15...30...Spacesuit component swap
Mon 08:42 AM...08...15...40...JPM RMS brake tests
Mon 09:52 AM...08...16...50...JPM RMS hold
Mon 10:07 AM...08...17...05...JPM RMS stow
Mon 11:17 AM...08...18...15...Crew off duty
Mon 01:17 PM...08...20...15...Joint crew meal
Mon 02:17 PM...08...21...15...Joint crew news conference
Mon 02:57 PM...08...21...55...Joint crew photo
Mon 04:07 PM...08...23...05...Oxygen system teardown
Mon 04:52 PM...08...23...50...Farewell ceremony
Mon 05:07 PM...09...00...05...Hatches closed
Mon 05:32 PM...09...00...30...Rendezvous tools checkout
Mon 05:32 PM...09...00...30...ODS leak check
Mon 06:07 PM...09...01...05...Spacesuits installed in airlock
Mon 08:32 PM...09...03...30...ISS crew sleep begins
Mon 09:02 PM...09...04...00...STS crew sleep begins
Flight Day 11
06/10/08
Tue 05:02 AM...09...12...00...Crew wakeup
Tue 07:02 AM...09...14...00...ISS daily planning conference
Tue 07:32 AM...09...14...30...Centerline camera setup
Tue 07:42 AM...09...14...40...Group B computer powerup
Tue 07:52 AM...09...14...50...PMA-2 prepped for undocking
Tue 08:02 AM...09...15...00...Undocking timeline begins
Tue 08:47 AM...09...15...45...UNDOCKING
Tue 09:55 AM...09...16...53...Separation burn No. 1
Tue 10:23 AM...09...17...21...Separation burn No. 2
Tue 10:32 AM...09...17...30...Post undocking computer reconfig
Tue 10:32 AM...09...17...30...Group B computer powerdown
Tue 10:32 AM...09...17...30...Undocking video replay
Tue 11:17 AM...09...18...15...Crew meal
Tue 12:17 PM...09...19...15...OBSS starboard wing survey
Tue 12:32 PM...09...19...30...EVA equipment stow
Tue 02:02 PM...09...21...00...OBSS nose cap survey
Tue 02:52 PM...09...21...50...OBSS port wing survey
Tue 05:02 PM...10...00...00...LDRI downlink
Tue 08:32 PM...10...03...30...STS/ISS crew sleep begins
Flight Day 12
06/11/08
Wed 04:32 AM...10...11...30...Crew wakeup
Wed 07:32 AM...10...14...30...Crew off duty
Wed 08:12 AM...10...15...10...NC6 orbit adjust burn
Wed 11:27 AM...10...18...25...PAO event
Wed 11:47 AM...10...18...45...Crew meal
Wed 12:47 PM...10...19...45...Crew off duty
Wed 03:47 PM...10...22...45...OBSS berthing
Wed 04:47 PM...10...23...45...SRMS powerdown
Wed 08:02 PM...11...03...00...Crew sleep begins
Flight Day 13
06/12/08
Thu 04:02 AM...11...11...00...Crew wakeup
Thu 07:07 AM...11...14...05...Cabin stow begins
Thu 07:37 AM...11...14...35...FCS checkout
Thu 08:47 AM...11...15...45...RCS hotfire
Thu 09:17 AM...11...16...15...Orbit adjust rocket firing
Thu 10:02 AM...11...17...00...PILOT operations
Thu 11:07 AM...11...18...05...Deorbit review
Thu 11:52 AM...11...18...50...Crew meal
Thu 12:52 PM...11...19...50...Cabin stow resumes
Thu 02:37 PM...11...21...35...PAO event
Thu 02:57 PM...11...21...55...Recumbent seat setup
Thu 03:27 PM...11...22...25...Launch/entry suit checkout
Thu 04:02 PM...11...23...00...KU antenna stow
Thu 04:12 PM...11...23...10...Laptop computer teardown (part 1)
Thu 04:28 PM...11...23...26...NC7 orbit adjust burn
Thu 07:32 PM...12...02...30...Crew sleep begins
Flight Day 14
06/13/08
Fri 03:32 AM...12...10...30...Crew wakeup
Fri 06:07 AM...12...13...05...Group B computer powerup
Fri 06:22 AM...12...13...20...IMU alignment
Fri 07:07 AM...12...14...05...Deorbit timeline begins
Fri 11:03 AM...12...18...01...Deorbit ignition (rev. 202)
Fri 12:05 PM...12...19...03...Landing
TWO-LINE ELEMENTS
As of: 6/2/07
Source: Space Track
Alternate Source: CelesTrak
Predicted space shuttle 2-line elements
TBD
STS-125/Hubble Servicing Mission No. 4 Summary Timeline
As of: 02/06/08 (times given in EDT and mission elapsed time):
DATE/ET........DD...HH...MM...EVENT
Flight Day 1
08/28/08
Thu 09:38 PM...00...00...00...STS-125 launch
Thu 10:23 PM...00...00...45...OMS-2 rocket firing
Thu 10:28 PM...00...00...50...Post insertion timeline begins
08/29/08
Fri 12:08 AM...00...02...30...SRMS powerup
Fri 12:08 AM...00...02...30...Laptop computer network setup
Fri 12:08 AM...00...02...30...SSE activation; OCAC setup
Fri 12:33 AM...00...02...55...SRMS checkout
Fri 12:38 AM...00...03...00...HST PGSCA config
Fri 01:33 AM...00...03...55...SRMS payload bay survey
Fri 01:33 AM...00...03...55...Umbilical well camera downlink
Fri 01:48 AM...00...04...10...Wing leading edge sensor system activation
Fri 01:53 AM...00...04...15...ET video downlink
Fri 01:53 AM...00...04...15...SSE checkout
Fri 02:03 AM...00...04...25...GIRA installation
Fri 02:53 AM...00...05...15...Group B computer powerdown
Fri 02:53 AM...00...05...15...Handheld ET video downlink
Fri 03:03 AM...00...05...25...SEE setup
Fri 03:38 AM...00...06...00...Crew sleep begins
Flight Day 2
Fri 12:38 PM...00...15...00...Crew wakeup
Fri 01:38 PM...00...16...00...Rendezvous rocket firing
Fri 01:53 PM...00...16...15...SRMS unberths OBSS
Fri 03:08 PM...00...17...30...PGSC setup (part 2)
Fri 03:23 PM...00...17...45...FSS prepped for berthing
Fri 03:38 PM...00...18...00...Ergineter setup
Fri 04:08 PM...00...18...30...Starboard wing inspection
Fri 04:18 PM...00...18...40...Cabin depress to 10.2 psi
Fri 04:18 PM...00...18...40...Airlock preps
Fri 05:08 PM...00...19...30...Spacesuit checkout
Fri 05:53 PM...00...20...15...Starboard tile survey
Fri 06:23 PM...00...20...45...Nose cap survey
Fri 06:53 PM...00...21...15...Spacesuit swap
Fri 07:23 PM...00...21...45...Crew meals begin
Fri 07:23 PM...00...21...45...BSA installation and configuration
Fri 08:23 PM...00...22...45...Port wing survey
Fri 08:53 PM...00...23...15...Spacesuit checkout
Fri 10:23 PM...01...00...45...Port tile TPS survey
Fri 11:53 PM...01...02...15...SSRMS berths OBSS
08/30/08
Sat 12:23 AM...01...02...45...OMS pod survey
Sat 12:58 AM...01...03...20...Rendezvous tools checkout
Sat 04:08 AM...01...06...30...Crew sleep begins
Flight Day 3
Sat 12:08 PM...01...14...30...Crew wakeup
Sat 12:23 PM...01...14...45...Rendezvous rocket firing
Sat 02:08 PM...01...16...30...Crew cabin survey
Sat 02:48 PM...01...17...10...Group B computer powerup
Sat 03:03 PM...01...17...25...Rendezvous operations timeline begins
Sat 03:19 PM...01...17...41...NH rendezvous rocket firing
Sat 04:25 PM...01...18...47...NC4 rendezvous rocket firing
Sat 06:02 PM...01...20...24...TI rendezvous rocket firing
Sat 08:14 PM...01...22...36...HST capture
Sat 09:03 PM...01...23...25...HST berthing
Sat 09:38 PM...02...00...00...HST survey
Sat 09:53 PM...02...00...15...External power on
Sat 11:28 PM...02...01...50...HST solar arrays slewed
Sat 11:53 PM...02...02...15...BSA checkout
08/31/08
Sun 12:08 AM...02...02...30...EVA-1: Procedures review
Sun 03:08 AM...02...05...30...Crew sleep begins
Flight Day 4
Sun 11:08 AM...02...13...30...Crew wakeup
Sun 12:23 PM...02...14...45...EVA-1: Preparations begin
Sun 12:38 PM...02...15...00...BSA checkout
Sun 12:53 PM...02...15...15...HST solar array slew to 90 degrees
Sun 01:53 PM...02...16...15...EVA-1: Spacesuit purge
Sun 02:03 PM...02...16...25...EVA-1: Spacesuit pre-breathe
Sun 02:43 PM...02...17...05...EVA-1: Airlock depressurization
Sun 02:53 PM...02...17...15...EVA-1: Spacesuits to battery power
Sun 02:58 PM...02...17...20...EVA-1: Airlock egress and setup
Sun 03:58 PM...02...18...20...EVA-1: WFC 3 installation
Sun 06:43 PM...02...21...05...EVA-1: Bay 3 battery pack
Sun 08:33 PM...02...22...55...EVA-1: Cleanup and airlock ingress
Sun 09:18 PM...02...23...40...EVA-1: Airlock repressurization
Sun 09:38 PM...03...00...00...Spacesuit servicing
Sun 10:33 PM...03...00...55...EVA-2: Tools configured
Sun 10:33 PM...03...00...55...LIOH and battery configs
Sun 11:08 PM...03...01...30...Spacesuit swap
Sun 11:48 PM...03...02...10...EVA-2: Procedures review
09/01/08
Mon 01:03 AM...03...03...25...HST solar array slew (0)
Mon 03:08 AM...03...05...30...Crew sleep begins
Flight Day 5
Mon 11:08 AM...03...13...30...Crew wakeup
Mon 12:23 PM...03...14...45...EVA-2: Preparations begin
Mon 01:53 PM...03...16...15...EVA-2: Spacesuit purge
Mon 02:03 PM...03...16...25...EVA-2: Spacesuit pre-breathe
Mon 02:43 PM...03...17...05...EVA-2: Airlock depressurization
Mon 02:53 PM...03...17...15...EVA-2: Spacesuits to battery power
Mon 02:58 PM...03...17...20...EVA-2: Airlock egress and setup
Mon 03:38 PM...03...18...00...EVA-2: Rate sensing unit replacement
Mon 07:13 PM...03...21...35...EVA-2: Bay 2 battery pack
Mon 09:03 PM...03...23...25...EVA-2: Cleanup and airlock ingress
Mon 09:48 PM...04...00...10...EVA-2: Airlock repressurization
Mon 09:58 PM...04...00...20...Spacesuit servicing
Mon 11:03 PM...04...01...25...EVA-3: Tools configured
Mon 11:03 PM...04...01...25...LIOH and battery config
Mon 11:38 PM...04...02...00...Spacesuit swap
09/02/08
Tue 12:18 AM...04...02...40...EVA-3: Procedures review
Tue 01:33 AM...04...03...55...HST solar array slew (0)
Tue 03:08 AM...04...05...30...Crew sleep begins
Flight Day 6
Tue 11:08 AM...04...13...30...Crew wakeup
Tue 12:23 PM...04...14...45...EVA-3: Preparations begin
Tue 01:53 PM...04...16...15...EVA-3: Spacesuit purge
Tue 02:03 PM...04...16...25...EVA-3: Spacesuit pre-breathe
Tue 02:43 PM...04...17...05...EVA-3: Airlock depressurization
Tue 02:53 PM...04...17...15...EVA-3: Spacesuits to battery power
Tue 02:58 PM...04...17...20...EVA-3: Airlock egress and setup
Tue 03:23 PM...04...17...45...EVA-3: Open -V2 ASD
Tue 03:48 PM...04...18...10...EVA-3: Cosmic Origins Spectrograph
Tue 06:23 PM...04...20...45...EVA-3: ACS repair (part 1)
Tue 08:33 PM...04...22...55...EVA-3: Close ASD
Tue 08:48 PM...04...23...10...EVA-3: Cleanup and airlock ingress
Tue 09:33 PM...04...23...55...EVA-3: Airlock repressurization
Tue 09:43 PM...05...00...05...Spacesuit servicing
Tue 10:48 PM...05...01...10...EVA-4: Tools configured
Tue 10:48 PM...05...01...10...LIOH and battery config
Tue 11:23 PM...05...01...45...Spacesuit swap
09/03/08
Wed 12:03 AM...05...02...25...EVA-4: Procedures review
Wed 03:08 AM...05...05...30...Crew sleep begins
Flight Day 7
Wed 11:08 AM...05...13...30...Crew wakeup
Wed 12:23 PM...05...14...45...EVA-4: Preparations begin
Wed 01:53 PM...05...16...15...EVA-4: Spacesuit purge
Wed 02:03 PM...05...16...25...EVA-4: Spacesuit pre-breathe
Wed 02:43 PM...05...17...05...EVA-4: Airlock depressurization
Wed 02:53 PM...05...17...15...EVA-4: Spacesuits to battery power
Wed 02:58 PM...05...17...20...EVA-4: Airlock egress and setup
Wed 03:33 PM...05...17...55...EVA-4: Open +V2 ASD
Wed 03:58 PM...05...18...20...EVA-4: STIS
Wed 07:23 PM...05...21...45...EVA-4: Close +V2 ASD
Wed 07:53 PM...05...22...15...EVA-4: NOBL 8
Wed 08:38 PM...05...23...00...EVA-4: Cleanup and airlock ingress
Wed 09:23 PM...05...23...45...EVA-4: Airlock repressurization
Wed 09:38 PM...06...00...00...Spacesuit servicing
Wed 10:38 PM...06...01...00...LIOH and battery config
Wed 10:38 PM...06...01...00...EVA-5: Tool config
Wed 11:13 PM...06...01...35...Spacesuit swap
Wed 11:53 PM...06...02...15...EVA-5: Procedures review
09/04/08
Thu 03:08 AM...06...05...30...Crew sleep begins
Flight Day 8
Thu 11:08 AM...06...13...30...Crew wakeup
Thu 12:23 PM...06...14...45...EVA-5: Preparations begin
Thu 01:53 PM...06...16...15...EVA-5: Spacesuit purge
Thu 02:03 PM...06...16...25...EVA-5: Spacesuit pre-breathe
Thu 02:43 PM...06...17...05...EVA-5: Airlock depressurization
Thu 02:53 PM...06...17...15...EVA-5: Spacesuits to battery power
Thu 02:58 PM...06...17...20...EVA-5: Airlock egress and setup
Thu 03:23 PM...06...17...45...EVA-5: FGS-2
Thu 06:03 PM...06...20...25...EVA-5: Open -V2 ASD
Thu 06:18 PM...06...20...40...EVA-5: ASC repair (part 2)
Thu 07:58 PM...06...22...20...EVA-5: Close -V2 ASD
Thu 08:13 PM...06...22...35...EVA-5: Cleanup and airlock ingress
Thu 09:28 PM...06...23...50...EVA-5: Airlock repressurization
Thu 09:38 PM...07...00...00...Spacesuit servicing
Thu 09:43 PM...07...00...05...HST solar array slew (90)
Thu 10:43 PM...07...01...05...LIOH and battery config
Thu 10:43 PM...07...01...05...EVA-6: Tool config
Thu 11:18 PM...07...01...40...Spacesuit swap
Thu 11:58 PM...07...02...20...EVA-6: Procedures review
09/05/08
Fri 03:08 AM...07...05...30...Crew sleep begins
Flight Day 9
Fri 11:08 AM...07...13...30...Crew wakeup
Fri 12:38 PM...07...15...00...Group B computer powerup
Fri 12:53 PM...07...15...15...SRMS grapples HST
Fri 02:08 PM...07...16...30...HST unberthing maneuver
Fri 02:08 PM...07...16...30...EVA prep
Fri 02:53 PM...07...17...15...HST release prep
Fri 03:57 PM...07...18...19...HST release
Fri 03:58 PM...07...18...20...Separation burn No. 1
Fri 04:38 PM...07...19...00...Separation burn No. 2
Fri 04:43 PM...07...19...05...Group B computer powerdown
Fri 04:58 PM...07...19...20...Crew meals
Fri 04:58 PM...07...19...20...FSS stow
Fri 05:58 PM...07...20...20...SRMS unberths OBSS
Fri 06:48 PM...07...21...10...Starboard wing survey
Fri 08:28 PM...07...22...50...Nose cap survey
Fri 09:38 PM...08...00...00...Port wing survey
Fri 11:08 PM...08...01...30...SRMS berths OBSS
09/06/08
Sat 02:38 AM...08...05...00...Crew sleep begins
Flight Day 10
Sat 10:38 AM...08...13...00...Crew wakeup
Sat 01:43 PM...08...16...05...Crew news conference
Sat 02:23 PM...08...16...45...SRMS powerdown
Sat 03:08 PM...08...17...30...Crew off duty
Sat 05:08 PM...08...19...30...Joint crew meal
Sat 06:08 PM...08...20...30...Crew off duty
09/07/08
Sun 02:08 AM...09...04...30...Crew sleep begins
Flight Day 11
Sun 10:08 AM...09...12...30...Crew wakeup
Sun 01:08 PM...09...15...30...Cabin stow begins
Sun 01:53 PM...09...16...15...Flight control system checkout
Sun 03:03 PM...09...17...25...RCS hotfire
Sun 03:18 PM...09...17...40...PILOT landing practice
Sun 04:18 PM...09...18...40...Deorbit review
Sun 04:48 PM...09...19...10...Joint crew meal
Sun 05:48 PM...09...20...10...Cabin stow resumes
Sun 06:28 PM...09...20...50...PAO event
Sun 06:48 PM...09...21...10...Entry video setup
Sun 07:33 PM...09...21...55...L-1 comm check
Sun 09:18 PM...09...23...40...Wing leading edge sensor system deactivation
Sun 09:38 PM...10...00...00...PGSC stow (part 1)
Sun 09:38 PM...10...00...00...KU antenna stow
Sun 10:08 PM...10...00...30...Ergometer stow
09/08/08
Mon 01:38 AM...10...04...00...Crew sleep begins
Flight Day 12
Mon 09:38 AM...10...12...00...Crew wakeup
Mon 11:33 AM...10...13...55...Group B computer powerup
Mon 11:48 AM...10...14...10...IMU alignment
Mon 12:18 PM...10...14...40...PGSC stow (part 2)
Mon 12:33 PM...10...14...55...Deorbit timeline begins
Mon 04:33 PM...10...18...55...Deorbit ignition (orbit 164)
Mon 05:40 PM...10...20...02...Landing